Foundry Casting Bridge Crane YZ Type
Lifting Capacity: 75t~320t
Span: 10m~40m
Lifting Height: 15m-30m
Work Level: A7~A8
Lifting Capacity: 75t~320t
Span: 10m~40m
Lifting Height: 15m-30m
Work Level: A7~A8
Type:QD
LiftingCapacity:5~800ton
LiftingHeight:12-22meter
Span:10.5~31.5meter
WorkingDuty:A5-A6
AmbientTemperature:-20~40℃
The main structure includes main beams, trolley traveling mechanism, electric trolley, hoisting mechanism, etc. Two double beams are the main supporting structure. With high quality steel, they have a strong frame that can withstand high pressure and bending when lifting heavy loads.
Lifting Capacity: 1~800ton
Lifting Height: 12-22meter
Span: 10.5~31.5meter
Working Duty: A3-A8
Ambient Temperature: -20~40℃
The 250t forging crane is designed with 3 beams and 4 tracks. This 250T forging crane will be employed to lift 1000 ℃ hot steel ingot for a 13, 500t hydraulic press for forging need.
China's equipment manufacturing industry continues to improve and the forging demand is also increasing. At the same time, the market for forging quality are more stringent. Forging production efficiency, quality improvement is largely improved due to the use of forged cranes. Forged cranes can lift, cushion and reverse the forging, which belongs to a special metallurgical crane.
The 250t forging crane uses a variety of safety devices with high safety and high reliability. It will be employed to lift 1000 ℃ hot steel ingot for a 13500t hydraulic press for forging need.
Features of 205t Forging Crane:
1. Designed with mechanical anti-shock function and mechanical anti-overload function, safe and reliable;
2. It can withstand 1.4 times static load and 1.2 times dynamic load;
3. Three-beam and four-track design, the main and vice beams are of wide flange partial rail box structure;
4. Equipped with a special upender to achieve lifting and turning of the workpiece;
5. The key parts adopt finite element analysis technology for check and calculation;
6. Flexible design, the use of bolts and hinges between the modules, easy installation and maintenance, improve plant utilization, reduce energy consumption, strong adaptability;
7. Computer simulation, analysis and control of of R & D results.

Coating

Bridge Assembly

Beam Installation

Trolley Installation

Upender Test

Full Set Installation

250t Forging Crane Installation Finished