Bridge Crane for Tube Reactor Handling
Lifting Capacity 5~800 ton
Lifting Height 12-22 meter
Span 10.5~31.5 meter
Working Duty A5-A6
Ambient Temperature -20~40℃
Lifting Capacity 5~800 ton
Lifting Height 12-22 meter
Span 10.5~31.5 meter
Working Duty A5-A6
Ambient Temperature -20~40℃
Lifting Capacity: 75t~320t
Span: 10m~40m
Lifting Height: 15m-30m
Work Level: A7~A8
Type:QD
LiftingCapacity:5~800ton
LiftingHeight:12-22meter
Span:10.5~31.5meter
WorkingDuty:A5-A6
AmbientTemperature:-20~40℃
The main structure includes main beams, trolley traveling mechanism, electric trolley, hoisting mechanism, etc. Two double beams are the main supporting structure. With high quality steel, they have a strong frame that can withstand high pressure and bending when lifting heavy loads.
The brige cranes produced by Henan Weihua Heavy Machinery Co., Ltd. undertook rocket assembly task, including hoisting, transportation, overturning, and testing of Long March No. 5.
At 20:45, China's Long March 5 Rocket launched at the Wenchang space launch site and the practice 20 satellite was accurately put into the predetermined orbit.
In this launch mission, the bridge cranes produced by Henan Weihua Heavy Machinery Co., Ltd. undertook the key link of rocket assembly jobs, including hoisting, transportation, overturning, and testing of Long March No. 5 in the factory building with high accuracy, helping the rocket launching successfully!
Weihua lifting equipment has long served China aerospace engineering, successfully completed several rocket assembly tasks, and won unanimous praise from the customer.
.jpg)