Bridge Crane for Tube Reactor Handling
Lifting Capacity 5~800 ton
Lifting Height 12-22 meter
Span 10.5~31.5 meter
Working Duty A5-A6
Ambient Temperature -20~40℃
Lifting Capacity 5~800 ton
Lifting Height 12-22 meter
Span 10.5~31.5 meter
Working Duty A5-A6
Ambient Temperature -20~40℃
Lifting Capacity: 75t~320t
Span: 10m~40m
Lifting Height: 15m-30m
Work Level: A7~A8
Type:QD
LiftingCapacity:5~800ton
LiftingHeight:12-22meter
Span:10.5~31.5meter
WorkingDuty:A5-A6
AmbientTemperature:-20~40℃
The main structure includes main beams, trolley traveling mechanism, electric trolley, hoisting mechanism, etc. Two double beams are the main supporting structure. With high quality steel, they have a strong frame that can withstand high pressure and bending when lifting heavy loads.
On May 25th, the second session of the Professional Committee of the Bridge Cranes of the China Heavy Machinery Industry Association was held in Changyuan.
On May 25th, the second session of the Professional Committee of the Bridge Cranes of the China Heavy Machinery Industry Association was held in Changyuan.

The leaders of the meeting hope that through this meeting, the connection between Changyuan and the association will be closer. The development status of the gantry crane industry was analyzed, the performance of work in 2017 was summarized, and the work plan for 2018 was deployed. After deliberation and decision by the council, the conference agreed to absorb 8 companies as new members. The conference also held a lifting industry technical seminar.
