500t Casting Bridge Crane
We announce that the 500t casting crane with 4-girder 6-rail...
Read More >Home / Project Cases > Bridge Crane 170t 80m for Stator Lifting at Power Plant
We announce that the 500t casting crane with 4-girder 6-rail...
Read More >Weihua fabricated 3 sets intelligent grab crane capacity 20T...
Read More >This double girder bridge crane with grab is widely applied ...
Read More >The world highest generator stator lifting was successfully completed in a power plant in Shaanxi Province, China. This lifting task is carried out by 2 sets 170-ton bridge cranes with a lifting height of 80m.
The weight of the generator stator is 290t and the height of the layout platform is 65m, which makes it the world's highest platform. Therefore, the project has extremely high requirements for the lifting cranes.
The large tonnage, super-large lifting height and super-high lifting accuracy of the 660MW steam turbine generator set mounted on the world first boiler have become an essential element of the Weihua cranes in this project.
This time, Weihua cranes replaced the orange coat to white color to match the uniform color of the power plant, and complete the lifting task.